    Referencing and using data already calculated

    is it possible to reference back to information on a spreadsheet automatically
    .

    example is i have a sheet to calculate the remainder of a bar of steel once a length is cut. i then want it to use this remainder to cut any other pieces if possible


    say

    length reqd no reqd stock length
    5160 8 10000
    9500 7 10000
    250 13 10000
    4705 6 10000

    i want it to check what is the remainder and then see if that can be used to cut any other length. then to tell me how many bars i'd need.

    i have a sheet made that will work out remainder lengths but don't know how to reference it back
    Last edited by twiggywales; 02-09-2012 at 11:35 AM.

  2. #2
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    here is the book i have done so far see if you get what i mean.

    Book2.xlsx

  3. #3
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    noone knows?? is it even possible?

  4. #4
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    can anyone help, or suggest a way to do it?


    Book2.xlsx

    i have also updated this a bit . but still struggling to get it to do what i need.
    Last edited by twiggywales; 02-10-2012 at 07:21 AM.

  5. #5
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    bump for no response.

    im thinking that this maynot be possilbe, maybe a macro or progam would be better?

  6. #6
    Registered User
    Join Date
    02-23-2010
    Location
    UK
    MS-Off Ver
    Excel 2007
    Posts
    14

    Re: Referencing and using data already calculated

    See the INT function, and use it to calc whole lengths, then multiply the result by the length reqd, then subtract from stock.

  7. #7
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    i already have the sheet doing that. if you look at column H,J,I it automaticly works out the length from 1 stock bar (typical r)emainder (or non typical remanders)

    or are you saying somthing else?

    what i need it to do is to take that remaining length and check it against the other stock lengths required and then use that instead of a full stock length

  8. #8
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    I have updated the sheet now will also show if the length cannot be cut from the stock length and will show if the remainder is under 150

    but still no luck getting it to reference it. it would have be bee somthing like

    check row "X" for number greater than Check row "Y" then use number "Y" instead of "Z"

    but in a continual for so it would check for longest lentgh then second then third etc

    i have attached the latest version to look at also. have a play see if you can figure it out.

    Book2.xlsx

  9. #9
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    bump again. should I let this die or does someone know.

    am I not clear or is it just not possible?

  10. #10
    Forum Contributor
    Join Date
    02-08-2012
    Location
    wales
    MS-Off Ver
    Excel 2007
    Posts
    173

    Re: Referencing and using data already calculated

    still holding out for hope

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.2.0