Hi everybody,
Lets say we are in a production company and we want to see the percentage of batches ready for production of the total.
I have a Pivottable with 4 columns.
column1: production date | column2: Total batches to produce | Column3: Batches prepared | Column4: % ready
For example: 20150719 | 100 | 85 | 85%
I'm having trouble getting this last column right. In a table it would be easy, formula would be: =column3/column2.
I tried with calculated fields but can't get this to work
Important is that when I refresh the table due to new data that the calculations stay in position. The length of the PT will also differ.
Any suggestions?