Hi,
I have been given a list with 4 shifts and downtimes and other data. The downtimes are put in as the value like 80, for 80 minutes.
I have made a table and created a Pivot Table.
I got now under Row the Shifts and the downtime under Values.
Shift 1 total 135
Shift 2 total 340
Shift 3 total 100
Shift 4 total 80
Can i change the 135,340,100,80 to 2.25h, 5.6h, 1.66h and 1.33h?
i don`t want to end up with 655 minutes , I just want a total of 10.9h or 10h 54min.
thanks for the help