Is there a way to break a chart in between a duration to show another
information?
Eg, column 1 is the time start (08:30), column 2 is time end (17:30),
column 3 is duration (9:00) between column 1 and 2. However on column
4 is lunch break start time (12:00) and column 5 is lunch break end
time (13:00). Is there a way to show the lunch break on a gantt
chart?
Any help is appreciated.
Thanks in advance.
Aloys
--