I have 2011 shipped by Q1,Q2,Q3,Q4 and 2012 shipped by those quarters as well. I however also have the cost that I want stacked on each data set but I want 2011 next to 2012. It would look like Q1 as the bottom axis then 2011 shipped with the cost stacked then 2012 shipped with the cost stacked next to it. I can't seem to find a way to get this to work.