+ Reply to Thread
Results 1 to 2 of 2

Need a fumula to change month based on the spreadsheets month

  1. #1
    Registered User
    Join Date
    09-21-2015
    Location
    Georgia, USA
    MS-Off Ver
    2013
    Posts
    1

    Need a fumula to change month based on the spreadsheets month

    I need to have identical spreadsheets for each month and cells that have service dates that are always the same day of each month.
    I would like to have only the month in the cells change according to the "absolute" cell that I have assigned to each month’s spreadsheet

    (i.e. January spreadsheet has JANUARY in cell K1 and A3 1/1/2015, A4 1/5/2015, A5 1/8/2015, A6 1/12/2015 ..... I would like to be able to create a copy of the whole JAN spreadsheet, rename it FEB, change K1 to FEBRUARY and have A3, A4, A5, A6,.... update automatically to say 2/1/2015, 2/5/2015, 2/8/2015,2/12/2015,......)

  2. #2
    Forum Moderator - RIP Richard Buttrey's Avatar
    Join Date
    01-14-2008
    Location
    Stockton Heath, Cheshire, UK
    MS-Off Ver
    Office 365, Excel for Windows 2010 & Excel for Mac
    Posts
    29,464

    Re: Need a fumula to change month based on the spreadsheets month

    Before you go too far with this layout consider whether you actually need separate monthly sheets. I've lost track of the number of times I've seen requests for common format sheets for stuff like months, weeks, departments, staff etc.

    What do you want to do with all this data when you've captured it. If any sort of analysis / comparison / totalling is required then almost certainly you're storing up a problem. Most of the time original data should be captured on a single sheet with just an additional column to capture the month/department/whatever.
    Richard Buttrey

    RIP - d. 06/10/2022

    If any of the responses have helped then please consider rating them by clicking the small star icon below the post.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 4
    Last Post: 10-10-2014, 01:28 AM
  2. Replies: 3
    Last Post: 07-16-2014, 02:53 PM
  3. [SOLVED] Determine work days in current month or next month based on day of the month
    By sbrnard in forum Excel Formulas & Functions
    Replies: 11
    Last Post: 05-29-2014, 05:14 PM
  4. [SOLVED] Change date in excel formulas from month to month automatically
    By ANDREAAS in forum Excel Formulas & Functions
    Replies: 5
    Last Post: 12-02-2013, 09:34 AM
  5. Replies: 4
    Last Post: 09-09-2013, 05:06 AM
  6. Formula to change work schedule from month to month
    By ibtrue in forum Excel Formulas & Functions
    Replies: 3
    Last Post: 03-29-2010, 04:55 AM
  7. Replies: 1
    Last Post: 10-09-2007, 11:45 AM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1