Hello All,
I'm wondering if there's an easier way to drag a formula where there is an alternating consistent column that needs to be skipped? I've attached an example file but here is the general idea that I was hoping to achieve.
I need to calculate the time difference between D4 against B4 which is (D4-B4) and this is shown in M4 and need to have it repeated on F4 against D4 (F4-D4) shown in N4.
How do I drag it easily across the next fields.
Please see the attached file.
Thank you so much!
Bookmarks