Hi
In the process of setting up a spreadsheet and we have a formula that works out our wip figure which is fine and works until a new job is added to the list.
However, the list of jobs on the left hand side links to another spreadsheet where new jobs are added when they are requested. So when a new job is added and the spreadsheet refreshes, all of the jobs move down a row including the cost per month as we have a v look up formula in there. However, because we are entering the date we last invoiced in each month ourselves and isnt looking for the date from another spreadsheet, it isnt looking for the job reference and therefore is remaining in the cell we first entered the date in . How do we do it so that it shifts down a row each time a project is added.
We have thought about adding another v look up formula but the spreadsheet is already really big and so if possible do not want to do this.
Please help!!!