Hi experts,

I am using a NETWORKDAYS formula to calculate turnaround time between two dates.
However, a lot of the dates are blank so the turnaround time is -30789 days.
I am using and imbedded IF formula for if one of the dates is blank, show "" in the cell which is fine, but I want to use maybe an IF(OR so it will also look at the second date, and if that's blank and do the same thing.

This will help me with my reporting which is in Power BI whicn i'm new to!

Thanks :-)