Moving data in financial forecast

  1. #1
    Registered User
    Join Date
    08-21-2005
    Posts
    2

    Question Moving data in financial forecast

    I am preparing a financial forecast and want to have the ability to move rows of revenue data to an earlier or later start date. For example, I have a contract beginning Dec 05 with monthly revenues running until Nov 07. I want to be able to change the start date and have the same numbers move to the right or left in the spreadsheet depending on the new input date. A what if concept.
    The at if function is too complex and each cell requires huge formulas. I have tried named ranges and I can cut and paste the whole range easily but then the links don't work. If Dec 05 is linked in my base worksheet to say Dec 05 in the P&L, if the data is moved to start Jan 06, the link stays in Dec05.
    I dont know if this is a macro/VBA issue or whether there is some other way. If someone could just tell me the excel functionality to explore that in itself would be helpful.
    I am sure this is a standard need but all the books and the posts I have read never seem to deal with it. Wouls appreciate some guidance.

  2. #2
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  3. #3
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  4. #4
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  5. #5
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  6. #6
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  7. #7
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  8. #8
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  9. #9
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  10. #10
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  11. #11
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  12. #12
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  13. #13
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  14. #14
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  15. #15
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  16. #16
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  17. #17
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  18. #18
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  19. #19
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  20. #20
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  21. #21
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  22. #22
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  23. #23
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  24. #24
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  25. #25
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  26. #26
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  27. #27
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


  28. #28
    PY & Associates
    Guest

    RE: Moving data in financial forecast

    Got your solution?
    I wish to try please.

    "ashleyfox" wrote:

    >
    > I am preparing a financial forecast and want to have the ability to move
    > rows of revenue data to an earlier or later start date. For example, I
    > have a contract beginning Dec 05 with monthly revenues running until
    > Nov 07. I want to be able to change the start date and have the same
    > numbers move to the right or left in the spreadsheet depending on the
    > new input date. A what if concept.
    > The at if function is too complex and each cell requires huge formulas.
    > I have tried named ranges and I can cut and paste the whole range easily
    > but then the links don't work. If Dec 05 is linked in my base worksheet
    > to say Dec 05 in the P&L, if the data is moved to start Jan 06, the
    > link stays in Dec05.
    > I dont know if this is a macro/VBA issue or whether there is some other
    > way. If someone could just tell me the excel functionality to explore
    > that in itself would be helpful.
    > I am sure this is a standard need but all the books and the posts I
    > have read never seem to deal with it. Wouls appreciate some guidance.
    >
    >
    > --
    > ashleyfox
    > ------------------------------------------------------------------------
    > ashleyfox's Profile: http://www.excelforum.com/member.php...o&userid=26493
    > View this thread: http://www.excelforum.com/showthread...hreadid=397600
    >
    >


+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1