+ Reply to Thread
Results 1 to 1 of 1

Day shift/night shift time calculation issue

  1. #1
    Registered User
    Join Date
    07-17-2007
    Posts
    4

    Day shift/night shift time calculation issue

    I am trying to develop a way of solving a day shift/ night shift problem (I attach a sample data dump the actual data to be analysed is hundreds of lines). If I have an exited off-site as the first entry of the day this means that the person worked night shift and I need to calculate the hours on site for that day from midnight. If the first entry of the day is a entry to site then I need to calculate the time between this event and the exited off-site event for each employee. If the employee does not exit off-site then I need to calculate the time from the entry to site until midnight.

    The sample data is in the format I can extract from my source system. Please assist me in solving this issue.

    Cheers
    Attached Files Attached Files

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1