Hi gurus,
I've really stucked with one of my spreadsheets where I need to calculate how much time I've got left before the earliest order needs to be despatched (it might be 2 or more on every day). This wouldn't be a problem if orders would be placed daily. But for every item it varies. For example: for "X" product there is an order in 3 days time to be despatched at 19:00. I have built a live clock in the spreadsheet but I can't work out the formula.
I've done dummy for you to look at if that helps. Any ideas guys?
Thanks in advance!
P.S. Also I need two time formats, first - days(text) hh:mm second - just a numeric value that can be formated as [hh:mm].
Bookmarks