is there a way to use Microsoft date and time picker control 6.0 sp4, when you pick the date, it will load cells
A1,C1,E1 and G1 on sheet4, all at the same time, I want to be able to pick the dates 2 to 5 days ahead.
Thanks
Keith
is there a way to use Microsoft date and time picker control 6.0 sp4, when you pick the date, it will load cells
A1,C1,E1 and G1 on sheet4, all at the same time, I want to be able to pick the dates 2 to 5 days ahead.
Thanks
Keith
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks