Formula calculation

  1. #1
    StompS
    Guest

    Formula calculation

    I have a simple amount due to contractors and a schedule of payments when
    they reach certain points in the job (ie 25% 50% 75% 100%). The calculations
    work out fien if everything goes according to schedule. But, if we amend the
    contract and increase the contract price, say, after the 50% payment is
    made....when I change the original amount, the two pyments already made will
    now change to their respective percentage of the NEW total amount. I don't
    want my data entry person to have to manually figure the payments. Is there
    a simple fix for this issue?

    Example:

    Original Data

    Formula Amount
    Calculated
    Contract Amount $5,000
    25% Down Contract Amount*.25 $1250
    50% Payment Contract Amount*.25 $1250

    Change in Contract

    Contract Increased to $6000

    If I change the Contract Amount, then even though I had paid $1250x2, it
    will now reflect that I paid $1500x2
    --

    StompS
    Portland, OR
    http://www.geocities.com/pdxinvestr/Stomps.html



  2. #2
    Sandy Mann
    Guest

    Re: Formula calculation

    This may be oversimplifying the problem but basically functions are volitile
    ie they will recalculate every time that it precedents change. You
    thereforte have to have different precedents for each formula:

    in G1:G4 I put 25%, 50%, 75% & 100% respectively. Enter the contract value
    as it increases in H1:H4.

    then in the payments cells:

    1st Payment:
    =IF(H1,H1*G1,"")
    2nd Payment:
    =IF(H2,H2*G2-D6,"")
    3rd Payment:
    =IF(H3,H3*G3-SUM($D$6:D7),"")
    Full Payment:
    =IF(H4,H4*G4-SUM($D$6:D8),"")

    --
    HTH

    Sandy
    [email protected]
    [email protected] with @tiscali.co.uk

    "StompS" <[email protected]> wrote in message
    news:[email protected]...
    >I have a simple amount due to contractors and a schedule of payments when
    >they reach certain points in the job (ie 25% 50% 75% 100%). The
    >calculations work out fien if everything goes according to schedule. But,
    >if we amend the contract and increase the contract price, say, after the
    >50% payment is made....when I change the original amount, the two pyments
    >already made will now change to their respective percentage of the NEW
    >total amount. I don't want my data entry person to have to manually figure
    >the payments. Is there a simple fix for this issue?
    >
    > Example:
    >
    > Original Data
    >
    > Formula Amount
    > Calculated
    > Contract Amount $5,000
    > 25% Down Contract Amount*.25 $1250
    > 50% Payment Contract Amount*.25 $1250
    >
    > Change in Contract
    >
    > Contract Increased to $6000
    >
    > If I change the Contract Amount, then even though I had paid $1250x2, it
    > will now reflect that I paid $1500x2
    > --
    >
    > StompS
    > Portland, OR
    > http://www.geocities.com/pdxinvestr/Stomps.html
    >
    >




  3. #3
    StompS
    Guest

    Re: Formula calculation

    I'm not sure I understand, is there somewhere I can check to figure out the
    concept you've introduced? I'm :THIS" close to figuring out what you are
    saying but am not sure where the "D" data came in.....thanks for the help- I
    think your formula will do the job if I can figure out where I lost you.....

    "Sandy Mann" <[email protected]> wrote in message
    news:[email protected]...
    > This may be oversimplifying the problem but basically functions are
    > volitile ie they will recalculate every time that it precedents change.
    > You thereforte have to have different precedents for each formula:
    >
    > in G1:G4 I put 25%, 50%, 75% & 100% respectively. Enter the contract
    > value as it increases in H1:H4.
    >
    > then in the payments cells:
    >
    > 1st Payment:
    > =IF(H1,H1*G1,"")
    > 2nd Payment:
    > =IF(H2,H2*G2-D6,"")
    > 3rd Payment:
    > =IF(H3,H3*G3-SUM($D$6:D7),"")
    > Full Payment:
    > =IF(H4,H4*G4-SUM($D$6:D8),"")
    >
    > --
    > HTH
    >
    > Sandy
    > [email protected]
    > [email protected] with @tiscali.co.uk
    >
    > "StompS" <[email protected]> wrote in message
    > news:[email protected]...
    >>I have a simple amount due to contractors and a schedule of payments when
    >>they reach certain points in the job (ie 25% 50% 75% 100%). The
    >>calculations work out fien if everything goes according to schedule. But,
    >>if we amend the contract and increase the contract price, say, after the
    >>50% payment is made....when I change the original amount, the two pyments
    >>already made will now change to their respective percentage of the NEW
    >>total amount. I don't want my data entry person to have to manually figure
    >>the payments. Is there a simple fix for this issue?
    >>
    >> Example:
    >>
    >> Original Data
    >>
    >> Formula Amount
    >> Calculated
    >> Contract Amount $5,000
    >> 25% Down Contract Amount*.25 $1250
    >> 50% Payment Contract Amount*.25 $1250
    >>
    >> Change in Contract
    >>
    >> Contract Increased to $6000
    >>
    >> If I change the Contract Amount, then even though I had paid $1250x2, it
    >> will now reflect that I paid $1500x2
    >> --
    >>
    >> StompS
    >> Portland, OR
    >> http://www.geocities.com/pdxinvestr/Stomps.html
    >>
    >>

    >
    >




  4. #4
    Sandy Mann
    Guest

    Re: Formula calculation

    I labelled cells C6:C9 "1st Payment", "2nd Payment", "3rd Payment", "Full
    Payment" respectively and put the formulas in D6:D9. As I said the
    percentages are in G1:G4 and the actual values of thre contract are in
    H1:H4. When the 1st Payment is due put the value of the contract in H1 -
    say $50,000 and D6 will return $12,500. when the 2nd payment - say the cost
    of the contract has increased to $60,000 enter that in H2 and D7 will return
    $17,500 and so on until the full contract is paid.

    Note that if the contract price remains at $60,000 the last two payments
    will be reduced to $15,000 each but this is how it should be if half of the
    final contract price is to be pain by the second payment.

    --
    HTH

    Sandy
    [email protected]
    [email protected] with @tiscali.co.uk


    "StompS" <[email protected]> wrote in message
    news:[email protected]...
    > I'm not sure I understand, is there somewhere I can check to figure out
    > the concept you've introduced? I'm :THIS" close to figuring out what you
    > are saying but am not sure where the "D" data came in.....thanks for the
    > help- I think your formula will do the job if I can figure out where I
    > lost you.....
    >
    > "Sandy Mann" <[email protected]> wrote in message
    > news:[email protected]...
    >> This may be oversimplifying the problem but basically functions are
    >> volitile ie they will recalculate every time that it precedents change.
    >> You thereforte have to have different precedents for each formula:
    >>
    >> in G1:G4 I put 25%, 50%, 75% & 100% respectively. Enter the contract
    >> value as it increases in H1:H4.
    >>
    >> then in the payments cells:
    >>
    >> 1st Payment:
    >> =IF(H1,H1*G1,"")
    >> 2nd Payment:
    >> =IF(H2,H2*G2-D6,"")
    >> 3rd Payment:
    >> =IF(H3,H3*G3-SUM($D$6:D7),"")
    >> Full Payment:
    >> =IF(H4,H4*G4-SUM($D$6:D8),"")
    >>
    >> --
    >> HTH
    >>
    >> Sandy
    >> [email protected]
    >> [email protected] with @tiscali.co.uk
    >>
    >> "StompS" <[email protected]> wrote in message
    >> news:[email protected]...
    >>>I have a simple amount due to contractors and a schedule of payments when
    >>>they reach certain points in the job (ie 25% 50% 75% 100%). The
    >>>calculations work out fien if everything goes according to schedule. But,
    >>>if we amend the contract and increase the contract price, say, after the
    >>>50% payment is made....when I change the original amount, the two pyments
    >>>already made will now change to their respective percentage of the NEW
    >>>total amount. I don't want my data entry person to have to manually
    >>>figure the payments. Is there a simple fix for this issue?
    >>>
    >>> Example:
    >>>
    >>> Original Data
    >>>
    >>> Formula Amount
    >>> Calculated
    >>> Contract Amount $5,000
    >>> 25% Down Contract Amount*.25 $1250
    >>> 50% Payment Contract Amount*.25 $1250
    >>>
    >>> Change in Contract
    >>>
    >>> Contract Increased to $6000
    >>>
    >>> If I change the Contract Amount, then even though I had paid $1250x2, it
    >>> will now reflect that I paid $1500x2
    >>> --
    >>>
    >>> StompS
    >>> Portland, OR
    >>> http://www.geocities.com/pdxinvestr/Stomps.html
    >>>
    >>>

    >>
    >>

    >
    >





  5. #5
    StompS
    Guest

    Re: Formula calculation

    Wow, I understand your formula.......I got it to work and it works great!
    Here is my challenge, I have a cell for the original contract amount and a
    cell for any increase in the amount and (added together) have a cell for the
    FULL contract amount (at that time). I can't have the current contract
    amount typed in a sperate cell when the next payment is made.. They way I
    have it set up is that there is my simple formula with SCHEDULED payments.
    The don't add into the formula to amount that has been paid unless the date
    field beside each payment <>"" which is the trigger to show payment and
    deduct it from the current owed amount. I guess I need some type of formula
    that, once the date field is triggered, the number becomes permanent and
    will not change if the contract amount changes AFTER that check has been
    paid.....am I dreaming?!?!? ; )

    Steve

    "Sandy Mann" <[email protected]> wrote in message
    news:ua%[email protected]...
    >I labelled cells C6:C9 "1st Payment", "2nd Payment", "3rd Payment", "Full
    > Payment" respectively and put the formulas in D6:D9. As I said the
    > percentages are in G1:G4 and the actual values of thre contract are in
    > H1:H4. When the 1st Payment is due put the value of the contract in H1 -
    > say $50,000 and D6 will return $12,500. when the 2nd payment - say the
    > cost
    > of the contract has increased to $60,000 enter that in H2 and D7 will
    > return
    > $17,500 and so on until the full contract is paid.
    >
    > Note that if the contract price remains at $60,000 the last two payments
    > will be reduced to $15,000 each but this is how it should be if half of
    > the
    > final contract price is to be pain by the second payment.
    >
    > --
    > HTH
    >
    > Sandy
    > [email protected]
    > [email protected] with @tiscali.co.uk
    >
    >
    > "StompS" <[email protected]> wrote in message
    > news:[email protected]...
    >> I'm not sure I understand, is there somewhere I can check to figure out
    >> the concept you've introduced? I'm :THIS" close to figuring out what you
    >> are saying but am not sure where the "D" data came in.....thanks for the
    >> help- I think your formula will do the job if I can figure out where I
    >> lost you.....
    >>
    >> "Sandy Mann" <[email protected]> wrote in message
    >> news:[email protected]...
    >>> This may be oversimplifying the problem but basically functions are
    >>> volitile ie they will recalculate every time that it precedents change.
    >>> You thereforte have to have different precedents for each formula:
    >>>
    >>> in G1:G4 I put 25%, 50%, 75% & 100% respectively. Enter the contract
    >>> value as it increases in H1:H4.
    >>>
    >>> then in the payments cells:
    >>>
    >>> 1st Payment:
    >>> =IF(H1,H1*G1,"")
    >>> 2nd Payment:
    >>> =IF(H2,H2*G2-D6,"")
    >>> 3rd Payment:
    >>> =IF(H3,H3*G3-SUM($D$6:D7),"")
    >>> Full Payment:
    >>> =IF(H4,H4*G4-SUM($D$6:D8),"")
    >>>
    >>> --
    >>> HTH
    >>>
    >>> Sandy
    >>> [email protected]
    >>> [email protected] with @tiscali.co.uk
    >>>
    >>> "StompS" <[email protected]> wrote in message
    >>> news:[email protected]...
    >>>>I have a simple amount due to contractors and a schedule of payments
    >>>>when
    >>>>they reach certain points in the job (ie 25% 50% 75% 100%). The
    >>>>calculations work out fien if everything goes according to schedule.
    >>>>But,
    >>>>if we amend the contract and increase the contract price, say, after the
    >>>>50% payment is made....when I change the original amount, the two
    >>>>pyments
    >>>>already made will now change to their respective percentage of the NEW
    >>>>total amount. I don't want my data entry person to have to manually
    >>>>figure the payments. Is there a simple fix for this issue?
    >>>>
    >>>> Example:
    >>>>
    >>>> Original Data
    >>>>
    >>>> Formula Amount
    >>>> Calculated
    >>>> Contract Amount $5,000
    >>>> 25% Down Contract Amount*.25 $1250
    >>>> 50% Payment Contract Amount*.25 $1250
    >>>>
    >>>> Change in Contract
    >>>>
    >>>> Contract Increased to $6000
    >>>>
    >>>> If I change the Contract Amount, then even though I had paid $1250x2,
    >>>> it
    >>>> will now reflect that I paid $1500x2
    >>>> --
    >>>>
    >>>> StompS
    >>>> Portland, OR
    >>>> http://www.geocities.com/pdxinvestr/Stomps.html
    >>>>
    >>>>
    >>>
    >>>

    >>
    >>

    >
    >
    >




  6. #6
    Sandy Mann
    Guest

    Re: Formula calculation

    Hi Steve,

    As I said before, functions as volatile - with automatic calculation they
    will ALWAYS recalculate when their precedent cells change.

    The $2 answer is to change the cells that have the calculated values that
    you want to remain from fornulas to values by copying the cell and pasting
    it back over itself with Paste Special > Values.

    The $5 answer is to use VBA code to do your calculation. The calculated
    values in the cells will then be values not formulas and so will not change.
    If you want to go with the $5 answer send me a copy of your spreadsheet, (or
    a sample file with the required cells in the correct positions if the data
    is sensitive) and I will send it back with the necessary code.

    To send the sheet change my address in the signature by replacing what it
    says. (maininator.com is a dummy address)
    --
    HTH

    Sandy
    [email protected]
    [email protected] with @tiscali.co.uk


    "StompS" <[email protected]> wrote in message
    news:[email protected]...
    > Wow, I understand your formula.......I got it to work and it works great!
    > Here is my challenge, I have a cell for the original contract amount and a
    > cell for any increase in the amount and (added together) have a cell for
    > the FULL contract amount (at that time). I can't have the current contract
    > amount typed in a sperate cell when the next payment is made.. They way I
    > have it set up is that there is my simple formula with SCHEDULED payments.
    > The don't add into the formula to amount that has been paid unless the
    > date field beside each payment <>"" which is the trigger to show payment
    > and deduct it from the current owed amount. I guess I need some type of
    > formula that, once the date field is triggered, the number becomes
    > permanent and will not change if the contract amount changes AFTER that
    > check has been paid.....am I dreaming?!?!? ; )
    >
    > Steve
    >
    > "Sandy Mann" <[email protected]> wrote in message
    > news:ua%[email protected]...
    >>I labelled cells C6:C9 "1st Payment", "2nd Payment", "3rd Payment", "Full
    >> Payment" respectively and put the formulas in D6:D9. As I said the
    >> percentages are in G1:G4 and the actual values of thre contract are in
    >> H1:H4. When the 1st Payment is due put the value of the contract in H1 -
    >> say $50,000 and D6 will return $12,500. when the 2nd payment - say the
    >> cost
    >> of the contract has increased to $60,000 enter that in H2 and D7 will
    >> return
    >> $17,500 and so on until the full contract is paid.
    >>
    >> Note that if the contract price remains at $60,000 the last two payments
    >> will be reduced to $15,000 each but this is how it should be if half of
    >> the
    >> final contract price is to be pain by the second payment.
    >>
    >> --
    >> HTH
    >>
    >> Sandy
    >> [email protected]
    >> [email protected] with @tiscali.co.uk
    >>
    >>
    >> "StompS" <[email protected]> wrote in message
    >> news:[email protected]...
    >>> I'm not sure I understand, is there somewhere I can check to figure out
    >>> the concept you've introduced? I'm :THIS" close to figuring out what you
    >>> are saying but am not sure where the "D" data came in.....thanks for the
    >>> help- I think your formula will do the job if I can figure out where I
    >>> lost you.....
    >>>
    >>> "Sandy Mann" <[email protected]> wrote in message
    >>> news:[email protected]...
    >>>> This may be oversimplifying the problem but basically functions are
    >>>> volitile ie they will recalculate every time that it precedents change.
    >>>> You thereforte have to have different precedents for each formula:
    >>>>
    >>>> in G1:G4 I put 25%, 50%, 75% & 100% respectively. Enter the contract
    >>>> value as it increases in H1:H4.
    >>>>
    >>>> then in the payments cells:
    >>>>
    >>>> 1st Payment:
    >>>> =IF(H1,H1*G1,"")
    >>>> 2nd Payment:
    >>>> =IF(H2,H2*G2-D6,"")
    >>>> 3rd Payment:
    >>>> =IF(H3,H3*G3-SUM($D$6:D7),"")
    >>>> Full Payment:
    >>>> =IF(H4,H4*G4-SUM($D$6:D8),"")
    >>>>
    >>>> --
    >>>> HTH
    >>>>
    >>>> Sandy
    >>>> [email protected]
    >>>> [email protected] with @tiscali.co.uk
    >>>>
    >>>> "StompS" <[email protected]> wrote in message
    >>>> news:[email protected]...
    >>>>>I have a simple amount due to contractors and a schedule of payments
    >>>>>when
    >>>>>they reach certain points in the job (ie 25% 50% 75% 100%). The
    >>>>>calculations work out fien if everything goes according to schedule.
    >>>>>But,
    >>>>>if we amend the contract and increase the contract price, say, after
    >>>>>the
    >>>>>50% payment is made....when I change the original amount, the two
    >>>>>pyments
    >>>>>already made will now change to their respective percentage of the NEW
    >>>>>total amount. I don't want my data entry person to have to manually
    >>>>>figure the payments. Is there a simple fix for this issue?
    >>>>>
    >>>>> Example:
    >>>>>
    >>>>> Original Data
    >>>>>
    >>>>> Formula Amount
    >>>>> Calculated
    >>>>> Contract Amount $5,000
    >>>>> 25% Down Contract Amount*.25 $1250
    >>>>> 50% Payment Contract Amount*.25 $1250
    >>>>>
    >>>>> Change in Contract
    >>>>>
    >>>>> Contract Increased to $6000
    >>>>>
    >>>>> If I change the Contract Amount, then even though I had paid $1250x2,
    >>>>> it
    >>>>> will now reflect that I paid $1500x2
    >>>>> --
    >>>>>
    >>>>> StompS
    >>>>> Portland, OR
    >>>>> http://www.geocities.com/pdxinvestr/Stomps.html
    >>>>>
    >>>>>
    >>>>
    >>>>
    >>>
    >>>

    >>
    >>
    >>

    >
    >




  7. #7
    StompS
    Guest

    Re: Formula calculation

    Sandy,

    I think I've got it handled here - thanks to you and a whole bunch of other
    people. I can't believe how accomodating you all are. Thank you again VERY
    VERY much!!!!!

    Steve


    "Sandy Mann" <[email protected]> wrote in message
    news:%[email protected]...
    > Hi Steve,
    >
    > As I said before, functions as volatile - with automatic calculation they
    > will ALWAYS recalculate when their precedent cells change.
    >
    > The $2 answer is to change the cells that have the calculated values that
    > you want to remain from fornulas to values by copying the cell and pasting
    > it back over itself with Paste Special > Values.
    >
    > The $5 answer is to use VBA code to do your calculation. The calculated
    > values in the cells will then be values not formulas and so will not
    > change. If you want to go with the $5 answer send me a copy of your
    > spreadsheet, (or a sample file with the required cells in the correct
    > positions if the data is sensitive) and I will send it back with the
    > necessary code.
    >
    > To send the sheet change my address in the signature by replacing what it
    > says. (maininator.com is a dummy address)
    > --
    > HTH
    >
    > Sandy
    > [email protected]
    > [email protected] with @tiscali.co.uk
    >
    >
    > "StompS" <[email protected]> wrote in message
    > news:[email protected]...
    >> Wow, I understand your formula.......I got it to work and it works great!
    >> Here is my challenge, I have a cell for the original contract amount and
    >> a cell for any increase in the amount and (added together) have a cell
    >> for the FULL contract amount (at that time). I can't have the current
    >> contract amount typed in a sperate cell when the next payment is made..
    >> They way I have it set up is that there is my simple formula with
    >> SCHEDULED payments. The don't add into the formula to amount that has
    >> been paid unless the date field beside each payment <>"" which is the
    >> trigger to show payment and deduct it from the current owed amount. I
    >> guess I need some type of formula that, once the date field is triggered,
    >> the number becomes permanent and will not change if the contract amount
    >> changes AFTER that check has been paid.....am I dreaming?!?!? ; )
    >>
    >> Steve
    >>
    >> "Sandy Mann" <[email protected]> wrote in message
    >> news:ua%[email protected]...
    >>>I labelled cells C6:C9 "1st Payment", "2nd Payment", "3rd Payment", "Full
    >>> Payment" respectively and put the formulas in D6:D9. As I said the
    >>> percentages are in G1:G4 and the actual values of thre contract are in
    >>> H1:H4. When the 1st Payment is due put the value of the contract in
    >>> H1 -
    >>> say $50,000 and D6 will return $12,500. when the 2nd payment - say the
    >>> cost
    >>> of the contract has increased to $60,000 enter that in H2 and D7 will
    >>> return
    >>> $17,500 and so on until the full contract is paid.
    >>>
    >>> Note that if the contract price remains at $60,000 the last two payments
    >>> will be reduced to $15,000 each but this is how it should be if half of
    >>> the
    >>> final contract price is to be pain by the second payment.
    >>>
    >>> --
    >>> HTH
    >>>
    >>> Sandy
    >>> [email protected]
    >>> [email protected] with @tiscali.co.uk
    >>>
    >>>
    >>> "StompS" <[email protected]> wrote in message
    >>> news:[email protected]...
    >>>> I'm not sure I understand, is there somewhere I can check to figure out
    >>>> the concept you've introduced? I'm :THIS" close to figuring out what
    >>>> you
    >>>> are saying but am not sure where the "D" data came in.....thanks for
    >>>> the
    >>>> help- I think your formula will do the job if I can figure out where I
    >>>> lost you.....
    >>>>
    >>>> "Sandy Mann" <[email protected]> wrote in message
    >>>> news:[email protected]...
    >>>>> This may be oversimplifying the problem but basically functions are
    >>>>> volitile ie they will recalculate every time that it precedents
    >>>>> change.
    >>>>> You thereforte have to have different precedents for each formula:
    >>>>>
    >>>>> in G1:G4 I put 25%, 50%, 75% & 100% respectively. Enter the contract
    >>>>> value as it increases in H1:H4.
    >>>>>
    >>>>> then in the payments cells:
    >>>>>
    >>>>> 1st Payment:
    >>>>> =IF(H1,H1*G1,"")
    >>>>> 2nd Payment:
    >>>>> =IF(H2,H2*G2-D6,"")
    >>>>> 3rd Payment:
    >>>>> =IF(H3,H3*G3-SUM($D$6:D7),"")
    >>>>> Full Payment:
    >>>>> =IF(H4,H4*G4-SUM($D$6:D8),"")
    >>>>>
    >>>>> --
    >>>>> HTH
    >>>>>
    >>>>> Sandy
    >>>>> [email protected]
    >>>>> [email protected] with @tiscali.co.uk
    >>>>>
    >>>>> "StompS" <[email protected]> wrote in message
    >>>>> news:[email protected]...
    >>>>>>I have a simple amount due to contractors and a schedule of payments
    >>>>>>when
    >>>>>>they reach certain points in the job (ie 25% 50% 75% 100%). The
    >>>>>>calculations work out fien if everything goes according to schedule.
    >>>>>>But,
    >>>>>>if we amend the contract and increase the contract price, say, after
    >>>>>>the
    >>>>>>50% payment is made....when I change the original amount, the two
    >>>>>>pyments
    >>>>>>already made will now change to their respective percentage of the NEW
    >>>>>>total amount. I don't want my data entry person to have to manually
    >>>>>>figure the payments. Is there a simple fix for this issue?
    >>>>>>
    >>>>>> Example:
    >>>>>>
    >>>>>> Original Data
    >>>>>>
    >>>>>> Formula Amount
    >>>>>> Calculated
    >>>>>> Contract Amount $5,000
    >>>>>> 25% Down Contract Amount*.25 $1250
    >>>>>> 50% Payment Contract Amount*.25 $1250
    >>>>>>
    >>>>>> Change in Contract
    >>>>>>
    >>>>>> Contract Increased to $6000
    >>>>>>
    >>>>>> If I change the Contract Amount, then even though I had paid $1250x2,
    >>>>>> it
    >>>>>> will now reflect that I paid $1500x2
    >>>>>> --
    >>>>>>
    >>>>>> StompS
    >>>>>> Portland, OR
    >>>>>> http://www.geocities.com/pdxinvestr/Stomps.html
    >>>>>>
    >>>>>>
    >>>>>
    >>>>>
    >>>>
    >>>>
    >>>
    >>>
    >>>

    >>
    >>

    >
    >




+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1