Hello, everybody! I need some help and if anybody can at least point me in the right direction I would be eternally grateful.
I work at a rehabilitation hospital. I am in charge of making the therapy schedule for all the patients each and every day. It is a time consuming process with a lot of variables. I'm trying to make this job a little easier for me so I have more time to work with the therapists and their patients, which is what I truly enjoy about the job.
The therapy schedule consists of three separate files. The two most important files are what we call the landscapes, one for physical therapy and one for occupational therapy. They are both set up in a similar fashion. The therapists are listed on the x axis and the times are listed on the y axis. In each cell, I input the patient's last name. Most of the scheduling is done on the landscapes. I get slowed down when I get to the third file, which is what I pass out to much of the hospital staff. It consists of the patients listed on the y axis and the times listed on the x axis. In each cell, I note what kind of therapy they have and with which therapist. I lose a lot of time transcribing what I scheduled on the landscapes to the actual schedule. I also occasionally make mistakes transferring the information. I do a lot of cut and paste and I sometimes lose track.
Is it possible to have the information on the two landscapes automatically synced with the schedule? If so, can anybody give me a lead on where to start? If it isn't possible, does anybody have any ideas on how to better manage these three files? I am proficient with a computer, but I don't have a programming background.
Thanks, everybody!
Bookmarks