+ Reply to Thread
Results 1 to 2 of 2

Reduce production cost based on the materials you have

  1. #1
    Registered User
    Join Date
    12-29-2019
    Location
    Cluj, Romania
    MS-Off Ver
    Google Spreadsheet
    Posts
    2

    Reduce production cost based on the materials you have

    Hello,

    You can check the attached sheet and see on the Info sheet there are the cells with Your Mats: SS,MS,SO,EO and to the right the amount of each material owned(which is editable and will change based on user and available materials at a give time). Now on the Testing Sheet i have the table with the data, what i need is that P.C.(G column) will change according to the materials you have(the initial cost is from B:E) so if i have all the materials that i need to craft that product the production will reduces the cost of those materials automatically, if i have just a part of the material then again reduces the cost of what i have and display the remaining amount i require. I hope i made myself clear on this and explained properly my problem. Thank you for your time.
    Attached Files Attached Files

  2. #2
    Registered User
    Join Date
    12-29-2019
    Location
    Cluj, Romania
    MS-Off Ver
    Google Spreadsheet
    Posts
    2

    Re: Reduce production cost based on the materials you have

    I wonder if it's possible .. i tried to think of different ways but well... Still if someone could help me out i would really appreciate.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1