Good morning,
I use excel to create bar charts and at times I need to change the scale of the horizontal axis. For example, we need to showcase oil reservoir qualities from point A to B. However, if we drill further than initially planned, we obviously need to extend our depth scale. When we extend the scale, the background grid increases laterally, however all the bars remain stationary and to not lock to the background.
Is there any way to lock these bars to the background grid so we do not have to manually adjust each bar?
Thanks in advance.
Bookmarks