+ Reply to Thread
Results 1 to 2 of 2

multi project time tracker VBA

  1. #1
    Registered User
    Join Date
    11-11-2019
    Location
    Montreal
    MS-Off Ver
    2016
    Posts
    1

    multi project time tracker VBA

    I am trying to write a code for multi timer as a daily task tracker:

    What I am trying to do cannot accomplish is a way to change my timer, which is now only on seconds only - no matter what I do to Hour: Minute: Seconds.
    I have pasted my code in my Userform.




    Please Login or Register  to view this content.
    Last edited by Pepe Le Mokko; 11-12-2019 at 03:43 AM.

  2. #2
    Forum Moderator Pepe Le Mokko's Avatar
    Join Date
    05-14-2009
    Location
    Belgium
    MS-Off Ver
    Excel 2010 on Linux
    Posts
    9,223

    Re: multi project time tracker VBA

    Administrative Note:

    Welcome to the forum.

    We would very much like to help you with your query, however you need to include code tags around your code.

    Please take a moment to add the tags. Posting code between tags makes your code much easier to read and copy for testing, and it also maintains VBA formatting.

    Please see Forum Rule #2 about code tags and adjust accordingly. Click on Edit to open your post, then highlight your code and click the # icon at the top of your post window. More information about these and other tags can be found here

    I did it for you this time. Please read forum rules. Thanks
    You really don't have to give me rep points for moderating. It's part of the job. Keep rep points for those who find solutions

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1