I am creating a roster based around multiple employees working different swings and down the bottom I want a total for combined hours for the day which I will be then using to calculate daily income generated.
The roster however has different words depending on an employees stage. For example 10 people might be on week 1 of their swing (W1), 10 on week 2 (W2) and 10 on R&R (RR). Along with this we also have codes for Holidays, Local work etc.
I have read some articles on the "If" type formulas but only under stand the very basic 1 cell usage. I have attached a copy of an example roster so that it shows what I am talking about. Could someone please help me with the coding.
Bookmarks