+ Reply to Thread
Results 1 to 1 of 1

Need help with a Macro to calculate the difference between accetped OT and declined

  1. #1
    Forum Contributor
    Join Date
    05-18-2012
    Location
    Chicopee, Ma
    MS-Off Ver
    Excel 2010
    Posts
    194

    Need help with a Macro to calculate the difference between accetped OT and declined

    I’m looking for a macro for (planned OT 5858) that will automatically populate all the “Dec” rows with the difference of the highest number.
    For example on Monday on the week of 7/15 the highest amount of OT worked that day was 2.5 hours. each employee has a value in the Dec “declined” row for that day, the value is equal to 2.5-Acc “accepted”. For example John S at the top of the page has a value in Acc of 1.5 because he accepted 1 hr of OT. (2.5-1= 1.5)
    What I want to do is run a macro when the month is done, that populates the sheet with the values for the Dec “declined” OT,

    Thanks in advance.
    Feel free to ad the macro and send it back.
    Attached Files Attached Files

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1