+ Reply to Thread
Results 1 to 1 of 1

Updating a Schedule based on a master schedule

  1. #1
    Registered User
    Join Date
    02-21-2013
    Location
    Canada
    MS-Off Ver
    Excel 2010
    Posts
    1

    Updating a Schedule based on a master schedule

    Hey there,

    I need to update a schedule based on a master. The master would get updated weekly so I want to have like a refresh button on a personal schedule so that it checks to see if the dates have change for tasks to be started and completed. The problem is that the master schedule, or database, is in different formating than the personal schedule. Attached I have given an example (There both in one workbook for convinience, usually they are in different workbooks). You can see that the "something" project has matching dates, but the "stuff" project has different dates. I would like to figure out how I can update the dates based on different tasks and add a comment with the previous value in the cell.
    Attached Files Attached Files

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1