In the attached file on the Resources tab, YELLOW row 6, I need a formula that looks at row 5 above and determines the amount of projects being done, then looks at the Variables tab row 5 to determine how many DTs are required for the # of projects.
Criteria for projects:
If 0 projects, than 0 DTs Teams
If 1-2 projects, than 1 DT
If 3 or more projects, than 1 DT per 2 projects & needs to round up to a whole number, BUT should round down depending on amount of projects (ie 5 projects should = 2 DTs meaning round down as you'd need 6 projects to round up to 3 DTs)