Hi,
I am looking to build a graph from the attached table where I can see the planned (EXT/INT) vs actual (EXT/INT) values side by side for each division (PSC/TSC/DSC/GTTSC/TOTAL) in a stacked bar.
EXP+INT PLAN in one stacked bar and then EXP+INT ACT adjacent to this for PSC and then this repeated for the other divisions.
I have attached the file and existing graph.
Thanks