+ Reply to Thread
Results 1 to 4 of 4

Calculate time by time periods splitting productivity

  1. #1
    Registered User
    Join Date
    03-08-2014
    Location
    texas
    MS-Off Ver
    Excel 2003
    Posts
    4

    Calculate time by time periods splitting productivity

    production01.png

    I am trying to figure a way to search for a cell that has a specific date and time range. There are several cell titles pending on the activity. I want to find a cell that has a time ** 7:30-15:30 , 15:31-17:30, 17:31-20:30. The end result is to calculate the activity between those time periods based on the data cells.

    Example

    If the date searched time field ** the activity ranges is 1635 I need to split the time and credit the activity time in the 730-1530 time and the rest on the 15:31-17:30 time

    I have been able to do it on a single labor group based on time alone, but when I try to add the DATE to it my numbers go null. Eventually i will need to add 11 labor groups daily for weeks at a time . Any ideas ?

    I am David taking on Goliath

    Thanks

    Excel 2007
    Last edited by cgfourman; 03-08-2014 at 10:32 PM. Reason: version

  2. #2
    Administrator FDibbins's Avatar
    Join Date
    12-29-2011
    Location
    Duncansville, PA USA
    MS-Off Ver
    Excel 7/10/13/16/365 (PC ver 2310)
    Posts
    52,938

    Re: Calculate time by time periods splitting productivity

    Hi and welcome to the forum

    Not sure if you know this or not, but excel treats time (real time) as a decimal ** 1 (day), so 06:00am is actually 0.25, 12 noon is 0.5 etc. And a date is just a number that represents how many days have passed since 1/1/1900. With that in mind, see if you can make use ** ths "cheap and nasty" sample that I threw together for another member....

    Also Please do not upload a picture ** your file...rather, upload a sample ** your workbook, showing what data you are working with, a few samples ** your expected outcome is (manually entered is ok) and how you arrived at that. (exclude sensitive info). Pictures are pretty much impossible to edit, and no-one wants to re-type your data for you Also, not all members can upload picture files (Company firewalls and stuff)
    Attached Files Attached Files
    1. Use code tags for VBA. [code] Your Code [/code] (or use the # button)
    2. If your question is resolved, mark it SOLVED using the thread tools
    3. Click on the star if you think someone helped you

    Regards
    Ford

  3. #3
    Registered User
    Join Date
    03-08-2014
    Location
    texas
    MS-Off Ver
    Excel 2003
    Posts
    4

    Re: Calculate time by time periods splitting productivity

    Book3.xlsx

    Thank you very much on all counts.

    here is the file that i am working on. Maybe it will make more sense seeing the data. I have been reading the book by Walkenback and getting a bit confused with some ** the formulas that he is referencing.

  4. #4
    Registered User
    Join Date
    03-08-2014
    Location
    texas
    MS-Off Ver
    Excel 2003
    Posts
    4

    Re: Calculate time by time periods splitting productivity

    First of all , my apologies.

    I have made several novice mistakes. I am using Excel 2007 with a reference book for excel 2013, and will be converting data to a 2010 format once at work.

    The excel sample is now formatted where its more understandable.

    Problem:
    I am evaluating efficiency times based on room utilization in three time blocks in minutes: 0730-1530,1531-1730,1731-close. After searching the threads I have been able to provide utilization in minutes based on a reference time table. I know I can use a logic equation to determine if the station was even open in each time block.

    My problem is that on a single unit the utilization will vary each day. There will be up to 5 different utilization points that will need to be calculated. This makes my arrays extremely vulnerable to errors. I can go in each day and make changes but would like to come up with an automation.

    The first hurdle is being able to find data clusters on a specific day to review utilization, and the ability to look at a range of dates for weekly utilization. The problem becomes more complex when this has to be done over 11 units.

    IS excel capable of doing this kind of complex calculations ?

    Reference File
    Book3.xlsx

    Thanks again for the direction I should go
    Attached Files Attached Files
    Last edited by cgfourman; 03-09-2014 at 03:07 PM.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. [SOLVED] Splitting Costs between half hourly time periods
    By bishbash89 in forum Excel Formulas & Functions
    Replies: 15
    Last Post: 10-29-2012, 05:25 AM
  2. Calculate time periods before and after 7pm
    By Sukeany in forum Excel General
    Replies: 2
    Last Post: 10-22-2011, 07:24 PM
  3. Calculate time between three periods
    By adhide in forum Excel General
    Replies: 1
    Last Post: 03-14-2011, 11:00 PM
  4. time durations within time periods (greater than/less than?)
    By rosieb13 in forum Excel Formulas & Functions
    Replies: 3
    Last Post: 06-08-2007, 10:38 AM
  5. [SOLVED] calculate time periods
    By umba-sr in forum Excel Formulas & Functions
    Replies: 1
    Last Post: 02-21-2006, 10:13 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1