I have 2 tabs (Sheet1 and Sheet2) within a spreadsheet and have created a
hyperlink within Sheet1 to Sheet2!D3. When I sort the data within Sheet2 the
hyperlink in sheet1 is still pointing to Sheet2!D3 even though the sort moved
the data to cell D5. The same problem occurs when I manually change the row
location within Sheet2. Why isn't the hyperlink retaining the new location
after the sort or manual cut/paste of a row?
Bookmarks