    Task calculator

    Hi excel community,

    This may be a big ask, but I am looking for a calculator that calculates the

    Shift start time (e.g. 7:30)
    Task start time (e.g. 10:00)
    Task duration (e.g. 2.5 hours)
    Tea breaks, lunch breaks (e.g. 9:am, 12pm)
    End of shift time. (e.g. 4pm)
    Non working days (e.g. Public holiday, Weekends)

    This requirement is to track the end time of a task only based on the start time (which could be anytime during the shift), and takes all breaktimes and close of business times into account.

    I tried coming up with a formula for this, but got lost in the complexity cos I'm not that bright really and I didn't do well at math.

    I'm looking to see if anybody has something fairly simple to understand, or if somebody has an idea about the type of function that would be required to do this.

    Much appreciated

    Cheers

  2. #2
    Forum Contributor
    Join Date
    03-05-2013
    Location
    Sydney
    MS-Off Ver
    Excel 2010
    Posts
    301

    Re: Task calculator

    After 75 veiws and not a single response my guess is that the question may not have made sense.

    I've drafted a task calculator. This has been updated and s attached. This demonstrates how it's meant to work. See Task tracker.xls

    The calculator takes into account the start of the day, the task start time, various breaks throughout the day, the end time, overtime, and the start of the following day.

    so far it works until you get to the next days break time. after that you start to realise that you need to begin duplicating cells but with additional days. I've now done this to demonstrate this fact.

    It seems all I need is a formula to stop this duplication. The obvious principle is that I can simple add a function into a cell becuase I need to track mulitple tasks.

    Can anybody please review the attached xls Task tracker.xls and advise.

    cheers
    Last edited by Journeyman3000; 12-07-2013 at 06:51 AM.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 0
    Last Post: 11-17-2013, 10:21 AM
  2. [SOLVED] IF contingent task closed, THEN change formatting of dependent task cell
    By tek_9 in forum Excel Formulas & Functions
    Replies: 5
    Last Post: 10-29-2012, 08:40 PM
  3. Previous Task and Next Task buttons aren't working
    By top.C.Crets in forum Excel Programming / VBA / Macros
    Replies: 1
    Last Post: 09-07-2012, 08:27 AM
  4. Integrated calculator in excel 07 instead of separate calculator
    By Wayne in forum Excel Programming / VBA / Macros
    Replies: 1
    Last Post: 07-26-2006, 11:20 AM
  5. dialog box for active cell task to speed repeditive task
    By Todd F. in forum Excel Programming / VBA / Macros
    Replies: 3
    Last Post: 08-09-2005, 10:05 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1