I have seen this: http://spreadsheetpage.com/index.php...ess_indicator/ and Andy Pope's website, but I am having trouble linking the progress up to my macro. Let's say I have some nested Macros, Macro3 is within Macro2 which is within Macro1.
I want to be able to run Macro1, and have a progress bar update from 0 to 100% as it calls Macro2 which loops through some stuff as it calls Macro1 which goes through its own loop.
Basically, my progress indicator code is the following...
The progress bar is called LVprogress and it has its own code:
I am at a loss at how to hook all of this up to my compound macro.
Bookmarks