    tracking flow / lead time need help

    Hello
    What I'm trying to do is create a worksheet to track and improve flow time.
    So in cell 1A i need to be able to scan in a product (0001234123), in A2 have it input current time and date. Then up to 7 days later I wan to be able to scan the same product code (0001234123) have it find where it was first scanned and add the new current date and time in A3. finally in A4 show the total time between the two scan's. I will be adding hundred's of different product numbers to it a day and want to be able to track the start and finish times on all of them.

    Thank you for you help
    Dave

  2. #2
    Forum Expert Mordred's Avatar
    Join Date
    07-06-2010
    Location
    Winnipeg, Canada
    MS-Off Ver
    2007, 2010
    Posts
    2,787

    Re: tracking flow / lead time need help

    Have you tried using a Gantt Chart? There are a lot of free downloads, all you have to do is google it.
    Last edited by Mordred; 09-27-2011 at 11:19 AM.
    If you're happy with someone's help, click that little star at the bottom left of their post to give them Reps.

    ---Keep on Coding in the Free World---

  3. #3
    Registered User
    Join Date
    03-09-2011
    Location
    USA
    MS-Off Ver
    Excel 2011 mac OSX
    Posts
    5

    Re: tracking flow / lead time need help

    I looked at them. Thank you for your help. The issue I'm having is I want to make it a simple to use as possible. There will be 3 shifts for people using it. I was hoping to have a computer using a shared file at the start and one at the end. All the operators would do is scan the bar code on the product. one point would start the clock/log in the part number the other would stop the clock using the bar code scanned to find the first time it was scanned and add a finished time in the cell next to the start time. I'm not sure if I'm being clear or not. If you don't understand please let me know Ill try to explain it better.
    Thank you again for you help.

    Dave

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1