I am trying to make a chart that shows how much wait time my drivers had to wait at EITHER the supplier or here at our site each day. In data below, for example, Hyundai on 1/31/2019 had 1.08 hour wait time while at Hyundai. KIA on 1/28/2019 had 0.57 minutes wait time here at our site. I want a graph that can show who caused the wait time and what day it occurred. Chart style is not important, if a line chart better suits this then that is fine.
What I would like is for the horizontal data to show the days from Sunday-Saturday from left to right. For the vertical scale, it would use the wait times shown below. And for the lines or bars, to show both of the two kinds of wait times either caused at the supplier, here at KAMTEK or both even in rare cases like that Precision Metals.
***I've been playing with this for three hours, time to give up and call in the experts!***
Cells are A1:E11
****Edit: Below is hard to read so I added a image of my excel screen
book1.png
1/31/2019 Hyundai 1.08 KAMTEK
2/1/2019 Hyundai 1.15 KAMTEK
1/28/2019 KIA KAMTEK 0.57
1/29/2019 KIA KAMTEK 2.52
1/28/2019 Precision Metals 0.75 KAMTEK 3.63
1/28/2019 Hyundai KAMTEK 0.83
1/30/2019 Crown KAMTEK 0.52
1/31/2019 Eaglebend 0.17 KAMTEK
1/30/2019 ARJ 2.73 KAMTEK
1/31/2019 Metekote 0.33 KAMTEK
2/1/2019 Metekote KAMTEK 2.14