    Hi,

    I have an Appointments sheet that has the total job times from the Invoice Data sheet (manually entered for now). My question is how can I schedule jobs that have too many hours? In the case of Invoice #102 has 16.0 total hours.

    Notice the jobs are shown on the Weekly Schedule sheet.

    I appreciate any thoughts or ideas on how to schedule these extended hour jobs.

    Thank you,
    Bart

  2. #2
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Is there a reason why you are sharing files in .xlsb format? Please be aware that some members will not open them as they are in a less secure format.
    Ali


    Enthusiastic self-taught user of MS Excel who's always learning!
    Don't forget to say "thank you" in your thread to anyone who has offered you help.
    You can reward them by clicking on * Add Reputation below their user name on the left, if you wish.

    Forum Rules (updated August 2023): please read them here.

  3. #3
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I was made aware they take up less space. What would you prefer? I don't want to get any violations.

  4. #4
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Here is the same file in macro enabled.

  5. #5
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    #102 has 18 hours ... What am I missing?

    My question is how can I schedule jobs that have too many hours?
    Where have you manually mocked up what you want to achieve? Do you want formula or VBA?

  6. #6
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Quote Originally Posted by Bart60 View Post
    I was made aware they take up less space. What would you prefer? I don't want to get any violations.
    They do, but you should only resort to them if the file is too big to attach.

    Having said this, you should not really share entire projects: a sample workbook with just the detail relevant to the query is enough - a few KB at most.

  7. #7
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    This project is with mock up data so far. Formulas or VBA will be acceptable thanks.

    I thought if an Invoice was too long to finish in one day it would carry over to the next day and day after that if needed.

    Normal working hours should be 8 to 5 I suppose. I'm just not sure how to do this with an automatic type of system. This is why I am asking for advice from experts that have experience on here.

    Thank you kindly

  8. #8
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    OK, but where have you mocked it up? You need to tell us what result you want and where it should appear.

    #102 is not 16 - it's 18.

  9. #9
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I did not mock up the extended hours yet I was referring to the rest of the workbook.

  10. #10
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Sorry - I have no idea what that means!

    Here's what we ask when you supply a sample workbook (see point #2):

    1. Make sure that your sample data are REPRESENTATIVE of your real data. The use of unrepresentative data is very frustrating and can lead to long delays in reaching a solution.

    2. Make sure that your desired results are also shown (mock up the results manually).

    3. Make sure that all confidential data is removed or replaced with dummy data first (e.g. names, addresses, E-mails, etc.).

    4. Try to avoid using merged cells as they cause lots of problems.

    Unfortunately the attachment icon doesn't work at the moment (it hasn't worked for years, and despite our repeatedly asking the technical team who own the forum to fix it, they can't be bothered to do so), so to attach an Excel file you have to do the following: just before posting, scroll down to Go Advanced and then scroll down to Manage Attachments. Now follow the instructions at the top of that screen.

    Please pay particular attention to point 2 (above): without an idea of your intended outcomes, it is often very difficult to offer appropriate advice.

  11. #11
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Oops yes you are correct it is 18.0

  12. #12
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Glad I'm not going bonkers!

    See post #10, please.

  13. #13
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I have no idea on how to do this yet is why I am asking. I was hoping for a creative solution from someone on here that may have faced a similar issue.

  14. #14
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I will return in an hour leaving for work now.

  15. #15
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    OK - but we can't offer a creative solution without some parameters. I have no idea at the moment, not even remotely, of what you are trying to do. This is the closest I got:

    I thought if an Invoice was too long to finish in one day it would carry over to the next day and day after that if needed. Normal working hours should be 8 to 5 I suppose.
    It's all a bit vague.

    How would you EXPECT the 18 hours to pan out? Give us something concrete and we can come up with a solution.

  16. #16
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Quote Originally Posted by Bart60 View Post
    I will return in an hour leaving for work now.
    OK - I may not be around when you get back. Maybe somebody else will be. Have a bit more of a think about how you'd like all this to work.

  17. #17
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I thought to start 8 am on day 1 until 5 pm which would take care of 8 hours allowing 1 hour lunch break. Day 2 same scenario which would take care of another 8 hours. Day 3 start at 8 am and finish job at 10 am.

  18. #18
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    OK - so how do you want it to look? Is this to be calculated all in one and the results to be entered here?

    Excel 2016 (Windows) 32 bit
    J
    K
    L
    4
    APP DATE
    START TIME
    END TIME
    5
    30/08/2019
    8:00 AM
    2:00 PM
    6
    7
    26/08/2019
    8:00 AM
    10:00 AM
    8
    27/08/2019
    6:00 AM
    11:00 AM
    9
    28/08/2019
    6:00 AM
    11:00 AM
    Sheet: Appointments

    If so, you may need to consider a column for the end date as well.

    What about weekends and holidays?
    Last edited by AliGW; 08-27-2019 at 08:42 AM.

  19. #19
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I copied it over to Sheet 1 and manually inserted rows to allow for the extra time. I also added another column for END DATE but not sure how to implement this.

    What do you think is it possible?

  20. #20
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Does it need to be on separate rows? I was thinking more like this:

    Excel 2016 (Windows) 32 bit
    I
    J
    K
    L
    M
    4
    JOB TIME
    APP DATE
    START TIME
    END DATE
    END TIME
    5
    6.0
    30/08/2019
    8:00 AM
    30/08/2019
    2:00 PM
    6
    18.0
    01/09/2019
    8:00 AM
    03/09/2019
    10:00 AM
    7
    2.0
    26/08/2019
    8:00 AM
    26/08/2019
    10:00 AM
    8
    5.0
    27/08/2019
    6:00 AM
    27/08/2019
    11:00 AM
    9
    5.0
    28/08/2019
    6:00 AM
    28/08/2019
    11:00 AM
    Sheet: Appointments

    Please answer my question about weekends and holidays.

  21. #21
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Typically no work on weekends or holidays. Might have to incorporate the actual holiday dates so they aren't included in the job scheduling.

    I like the one row per invoice that you have shown.

  22. #22
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    By the way, your timings are not logical. Why would you spread 18 hours over three days when it can be done in two (9 hours per day)? Are you secretly building in a lunch hour? If so, that also needs to be taken into account.

  23. #23
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    There needs to be lunch allowed some how. I am very sorry for my lack of details at this point.

  24. #24
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Let me have some time to think about these ideas. You have made some things very clear and I appreciate your logic.

  25. #25
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Yes, you would need to specify the holiday dates somewhere in the workbook.

    I've run out of time for today - sorry. Hopefully someone else will pick this up.

    I think you are at least beginning to see what I meant about providing us with parameters - this will stand you in good stead next time you start a thread (and in this one).

  26. #26
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Thanks for your help have a nice evening.

  27. #27
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Thank you. Not offline yet - but busy doing other things, so can't focus on anything major at the moment.

  28. #28
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Hello again,

    I have made some changes to the Appointments sheet. There are cells L5:M9 with orange fill color that I please request formulas. I put some notes in the yellow boxes and hopefully have enough detail to figure out the logic.

    Thank you very much in advance for your help,
    Bart

  29. #29
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I am closing this thread because I didn't have the correct details. I hope it is okay to start a fresh thread with better specifics.

  30. #30
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    No, it's not. You may not have duplicate threads here (see rule #5). Please just add a fresh post and new workbook with the details here. Thanks.

  31. #31
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I did so in #28 but since this thread started out poorly I have doubts about getting help. I am aware it is my fault entirely.

  32. #32
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    I'm sorry - you have to continue here. This happens a lot - you will get help. As it happens, I have already put out a request for assistance here as I am not able to continue myself today.

    Just so that you are aware, those who help here do so voluntarily and of their own goodwill, so help may not come as quickly as you might like. It may take a few hours - some of our regulars may not even have looked yet because they are in a different time zone. Thanks for your understanding and patience.

  33. #33
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    Okay I appreciate the information and I will be patient.

  34. #34
    Forum Moderator AliGW's Avatar
    Join Date
    08-10-2013
    Location
    Retired in Ipswich, Suffolk, but grew up in Sawley, Derbyshire (England)
    MS-Off Ver
    MS 365 Subscription Insider Beta Channel v. 2404 (Windows 11 22H2 64-bit)
    Posts
    80,830

    Re: Job Time Scheduling Issues

    Thanks. If you get no further 'bites' over the next 24 hours, feel free to 'bump' the thread by posting to it again tomorrow.

  35. #35
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I was able to solve the issues except for the END TIME column.
    Last edited by Bart60; 08-28-2019 at 06:49 AM.

  36. #36
    Forum Moderator - RIP Richard Buttrey's Avatar
    Join Date
    01-14-2008
    Location
    Stockton Heath, Cheshire, UK
    MS-Off Ver
    Office 365, Excel for Windows 2010 & Excel for Mac
    Posts
    29,464

    Re: Job Time Scheduling Issues

    You seem keen to start new threads when you add a new requirement to a workbook in which you have already received advice.

    Why do you do this? I've previously asked you in situations like this not to do that and where you want some new help with the original workbook to continue in that original thread. I see this thread, started only this morning, now has over 30 responses. Having previously asked you stick to the original thread I would normally have closed this thread much earlier but given all that's been posted I'll leave it be this time. But note for the future. I do not expect to see new threads opened for this workbook as you continue to develop the system.


    It's also in your own interests to stick to one thread per workbook since those who have previously helped with the workbook will automatically receive a prompt about a follow up and they'll already be au fait with the subject matter and be more inclined to dip in again.

    I see you previously reported me since you objected to my closing a previous thread of yours. That's up to you of course but I have to say that since I'd previously explained why it was being closed I'm surprised that you paid no heed and have started this one.
    Richard Buttrey

    RIP - d. 06/10/2022

    If any of the responses have helped then please consider rating them by clicking the small star icon below the post.

  37. #37
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I suppose you don't want me on here which is fine. Don't beat around the bush about and just close my account if that is how you feel.

    I was told by some users it is better to start a new thread if it is about a different subject and within the same workbook.

    So since there aren't any set guidelines about this and the rules in your mind matter more than helping someone that means no harm whatsoever do as you wish.

  38. #38
    Administrator FDibbins's Avatar
    Join Date
    12-29-2011
    Location
    Duncansville, PA USA
    MS-Off Ver
    Excel 7/10/13/16/365 (PC ver 2310)
    Posts
    52,936

    Re: Job Time Scheduling Issues

    Bart, first of all, please do not feel that we dont want you here - of course we do

    If you feel the question is closely related to a question you have already asked, then consider sticking with the same thread.

    If the question is based on the same data/workbook, but is unrelated, then it is best if you start a new thread.

    The reason being, if it is closely related, then the work already done, may be of use moving forward, so it may be useful to refer back to it. If is is different, then was was done before really has no relevance to the new question.
    1. Use code tags for VBA. [code] Your Code [/code] (or use the # button)
    2. If your question is resolved, mark it SOLVED using the thread tools
    3. Click on the star if you think someone helped you

    Regards
    Ford

  39. #39
    Forum Moderator - RIP Richard Buttrey's Avatar
    Join Date
    01-14-2008
    Location
    Stockton Heath, Cheshire, UK
    MS-Off Ver
    Office 365, Excel for Windows 2010 & Excel for Mac
    Posts
    29,464

    Re: Job Time Scheduling Issues

    Quote Originally Posted by Bart60 View Post
    I suppose you don't want me on here which is fine. Don't beat around the bush about and just close my account if that is how you feel.

    I was told by some users it is better to start a new thread if it is about a different subject and within the same workbook.

    So since there aren't any set guidelines about this and the rules in your mind matter more than helping someone that means no harm whatsoever do as you wish.
    I don't intend debating this matter further but for the record.
    You can suppose as much as you like but I have no wish to close your account. I do expect you to listen to what you're asked to do.

    And for the record as far as I can see I've spent quite a bit of time on your earlier workbook, added additional functionality in connection with a new database layout and offered a better way forward - which I see you have taken up and have included. I think I have helped you considerably so I resent your implication that I don't care about this.

  40. #40
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    You closed a thread that was in the same workbook but a totally unrelated subject. I would prefer that you take the time to read a thread before jumping to a conclusion. But it may not be within your abilities or perhaps lack of effort to do so.

    I was picked on by you for what should have been left alone so I could have received help.

    There are some on here that I have found are genuinely concerned and willing to help someone that needs help.

    I have voiced my opinion so please do not reply unless of course I am violating some rules. It is perfectly clear to me how you feel.

    Thank you

  41. #41
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    New day today hopefully I don't make someone upset with me. I need formulas for the END TIME in post #35 please.

    Thank you

  42. #42
    Banned User!
    Join Date
    08-14-2019
    Location
    UK
    MS-Off Ver
    2010
    Posts
    72

    Re: Job Time Scheduling Issues

    I figured it out thanks anyway.



    Last edited by Bart60; 08-28-2019 at 10:09 AM.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. [SOLVED] Employee Scheduling Issues
    By acappella in forum Excel Programming / VBA / Macros
    Replies: 8
    Last Post: 01-16-2020, 01:30 AM
  2. Gantt scheduling chart issues
    By rgholmes08 in forum Excel Charting & Pivots
    Replies: 4
    Last Post: 09-28-2014, 03:58 PM
  3. Scheduling: Calendar style scheduling based on scheduling list
    By denkatprieto in forum Excel Formulas & Functions
    Replies: 0
    Last Post: 12-19-2012, 11:10 AM
  4. [SOLVED] Time scheduling
    By Geoff in forum Excel Formulas & Functions
    Replies: 0
    Last Post: 09-06-2005, 07:05 AM
  5. [SOLVED] Time scheduling
    By Geoff in forum Excel Formulas & Functions
    Replies: 0
    Last Post: 09-06-2005, 02:05 AM
  6. Time scheduling
    By Geoff in forum Excel Formulas & Functions
    Replies: 0
    Last Post: 09-05-2005, 11:05 PM
  7. Time scheduling
    By Geoff in forum Excel Formulas & Functions
    Replies: 0
    Last Post: 09-05-2005, 10:05 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1