Right now I have a summary sheet to track projects through the beginning of the design phase, all the way through construction completion. Attached is an image of the visible columns, it goes all the way out to AJ.
What I cannot figure out how to do is starting in column AK is to start a gantt chart or something similar. I posted a photo of what we currently do manually, but would think it is possible to pull the information from the dates on the summary sheet.
I should note that I am not very good with this and have pieced my workbook together of the past 10 or so years.